CEDARSTONE
 CONSTRUCTION, INC.
 

Master Bedroom and Bathroom Remodel

Complete remodel of master bathroom, new granite vanity tops and sinks, new over sized shower with multiple shower heads, and granite bench. All new tile work with heated tile floor.
 

Finished Basement Family Room, Kitchenette and Bathroom

 

Fireplace and Family Room

 

Porch

 

4 Season Porch

 

Changed Deck into 4 Season Porch

 

Stone Fireplace

 

Foyer

Removed carpet from steps, and vinyl flooring from foyer. Installed new wood steps with bead board risers and boot bench with cubbies for baskets. Installed shelf with basket cubbies and pegs for coats. Installed bead board on walls and new flooring in foyer.
 

Finished Laundry Room

 

Basement Man Cave

Finished basement, framed archways, and soffited ceiling. Installed two sided fireplace, installed bathroom, All Cherry cabinets, theater bar, entertainment center, bar, and ceiling panels, sound/theater system.